HVEH site map — 25 proposed locations across Newark, Belleville, and Harrison showing module size, cost, and flood mitigation capacity

HVEH deployment — tri-city corridor
Newark · Belleville · Harrison · 25 modules
Small — CSO outfall / retention basin
~40 kW · ~$60k · flood −20–30%
Medium — tidal channel / river reach
~200 kW · ~$150k · flood −30–40%
Large — harbor tidal gate
~500 kW · ~$500k · flood −40–50%
25
modules
$2.8M
est. build cost
2.6 MW
storm generation
−30–50%
peak flood reduction
Click a site on the map to see details